Project 2 Acquired
About Project 2 Acquired
Phase One is currently ongoing
Key goals is to setup on our (NG) well-sites; Install storage tanks to supply power to the Blockchain technologies.
Phase Two:
Installation of Carbon CO2/Methane CH4 capture equipment to begin the capture process, at Well-site (1) each site will require the installation of Capture equipment. Some sites will require a pooling as some others will possess more than enough emissions on their own.