Project 2 Acquired

About Project 2 Acquired

Phase One is currently ongoing

Key goals is to setup on our (NG) well-sites; Install storage tanks to supply power to the Blockchain technologies.

Phase Two:
Installation of Carbon CO2/Methane CH4 capture equipment to begin the capture process, at Well-site (1) each site will require the installation of Capture equipment. Some sites will require a pooling as some others will possess more than enough emissions on their own.

Call Center

Call us for more information or business inquiry.

+7193524341

(Toll Free)

Scroll to Top