Project 4 Acquisition

About Project 4 Acquisition

Phase Two is the acquisition of Project 4 and their (80) Oil well-sites.

Key goals will be to start setup on (8) of their major well-sites and start the process to converge their smaller well-sites onto a single rally point. Here storage tanks will be staged to supply power to the Blockchain technologies.

Phase Two:
Installation of Carbon CO2/Methane CH4 capture equipment to begin the capture process, at Well-site (1) each site will require the installation of Capture equipment. Some sites will require a pooling as some others will possess more than enough emissions on their own.

  1. Project 4 holds the largest wellsite count which will increase Cryptic Petroleum holdings on the Basin, its Oil production, and its Blockchain revenue stream. By consuming (80) wellsite’s with the infrastructure of CO2/CH4 capture at each wellsite along the Basin landscape it is believed that this will hold a key impact of Greenhouse emissions on the immediate area. It is believed by recycling the surrounding environments carbon/methane emissions the overall impact will reduce Greenhouse by 56-79% across the Basin.
  2. The Acquisition holds another potential resource; holdings potentially include a drilling service division. This division routinely performs repairs, testing, drilling operations along the Basin.

Call Center

Call us for more information or business inquiry.

+7193524341

(Toll Free)

Scroll to Top